TY - GEN
T1 - A Method to Derive the Top Goal of GSN that Describes the Design Process Achieving Two Objectives Simultaneously
AU - Nagatoshi, Hikaru
AU - Shirasaka, Seiko
AU - Haruyama, Shinichiro
N1 - Publisher Copyright:
© 2021 IEEE.
PY - 2021
Y1 - 2021
N2 - Previous studies pointed out that it is difficult to achieve two objectives simultaneously. In this study, we address this problem from a design perspective. We can categorize a system as either a 'designed' system or an 'undesigned' system. We address the pattern of integrating a Designed Monolithic System (DMS) with an Undesigned Monolithic System (UMS) to design a monolithic system that achieves two objectives simultaneously: a combination of 'Designed and Undesigned'. The objective realizing by DMS is 'original objective', which is the planned objective, and the objective realizing by UMS is 'unplanned objective'. The purpose of this study is to propose a framework to derive objective that should be described as the top goal within Goal Structuring Notation (GSN), which will be design methods and assurance methods, in order to simultaneously achieve the original objective and objective that were not planned at the time of design.
AB - Previous studies pointed out that it is difficult to achieve two objectives simultaneously. In this study, we address this problem from a design perspective. We can categorize a system as either a 'designed' system or an 'undesigned' system. We address the pattern of integrating a Designed Monolithic System (DMS) with an Undesigned Monolithic System (UMS) to design a monolithic system that achieves two objectives simultaneously: a combination of 'Designed and Undesigned'. The objective realizing by DMS is 'original objective', which is the planned objective, and the objective realizing by UMS is 'unplanned objective'. The purpose of this study is to propose a framework to derive objective that should be described as the top goal within Goal Structuring Notation (GSN), which will be design methods and assurance methods, in order to simultaneously achieve the original objective and objective that were not planned at the time of design.
KW - Assurance Case
KW - Goal Structuring Notation
KW - Top Goal
UR - http://www.scopus.com/inward/record.url?scp=85133163804&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85133163804&partnerID=8YFLogxK
U2 - 10.1109/IIAI-AAI53430.2021.00114
DO - 10.1109/IIAI-AAI53430.2021.00114
M3 - Conference contribution
AN - SCOPUS:85133163804
T3 - Proceedings - 2021 10th International Congress on Advanced Applied Informatics, IIAI-AAI 2021
SP - 637
EP - 642
BT - Proceedings - 2021 10th International Congress on Advanced Applied Informatics, IIAI-AAI 2021
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 10th International Congress on Advanced Applied Informatics, IIAI-AAI 2021
Y2 - 11 July 2021 through 16 July 2021
ER -