Abstract
This paper is concerned with classical concave cost multi-echelon production/inventory control problems studied by W. Zangwill and others. It is well known that the problem with m production steps and n time periods can be solved by a dynamic programming algorithm in O (n4m) steps, which is considered as the fastest algorithm for solving this class of problems. In this paper, we will show that an alternative 0-1 integer programming approach can solve the same problem much faster particularly when n is large and the number of 0-1 integer variables is relatively few. This class of problems include, among others problem with set-up cost function and piecewise linear cost function with fewer linear pieces. The new approach can solve problems with mixed concave/convex cost functions, which cannot be solved by dynamic programming algorithms.
| Original language | English |
|---|---|
| Pages (from-to) | 447-457 |
| Number of pages | 11 |
| Journal | Computational Management Science |
| Volume | 6 |
| Issue number | 4 |
| DOIs | |
| Publication status | Published - 2009 |
| Externally published | Yes |
Keywords
- 0-1 integer programming
- Concave cost inventory control problem
- Dynamic programming algorithm
ASJC Scopus subject areas
- Management Information Systems
- Information Systems
Fingerprint
Dive into the research topics of 'Comparative studies on dynamic programming and integer programming approaches for concave cost production/inventory control problems'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS